OUR CLIENTS & PROJECTS
SOME OF OUR CLIENTS ARE:
Building a Stronger Tomorrow
HINDUSTAN COCA – COLA BEVERAGES PVT.LTD
A turnkey precast facility for one of the world's biggest beverage brands.
- 1st Building Project in India with 23m height / 85 Ton Precast columns.
- 1st Building Project in India with 25.4m length / 136 Ton Pre-stressed beams.
- Use of 3D Volumetric Precast Lift Shafts & Stair Wells.
- Precast Prestressed Slabs with 2 Ton/Sqm loading.
ResidentialGHMC AFFORDABLE HOUSING
Thousands of homes, nine storeys high, built in precast for GHMC.
Oil & Gas / IndustrialL&T ENERGY HYDROCARBON
Substation buildings delivered for L&T inside a live refinery, where precision was non-negotiable.
IndustrialSAI LIFE SCIENCES R&T CENTRE
A research centre for one of India's leading pharma companies, built in precast.
Judiciary / GovernmentHIGH COURT OF ANDHRA PRADESH
Hollow core slabs carrying the floors of the Andhra Pradesh High Court.
InstitutionalJAKKAMPUDI ECONOMIC TOWNSHIP (JET CITY)
An entire economic township, raised block by block in precast.
ResidentialBDA AFFORDABLE HOUSING
A full housing community for BDA, designed, cast and built in-house.
IndustrialMUSHROOM PLANT
A complete cultivation plant in precast, where the story began in 2007.
IndustrialVIRUPAKSHA GROUP
A full G+5 industrial facility, delivered end to end.
CommercialSATTVA IMAGE TOWER
Hollow core slabs holding every floor of a twenty-storey tower over four basements.
KEY INFORMATION · HCCB GF PROJECT @ HYDERABAD
Hindustan Coca-Cola Beverages Pvt. Ltd.
Construction of Precast structure including Design, Production, Transportation & Erection of Precast Elements: Precast Columns, Pre-Stressed Beams, Precast RCC Beams, Precast Walls, Prestressed Slabs, Precast Gutters, 3D Volumetric Precast Lift Shafts & Stair Wells.
- 1st Building Project in India with 23m height / 85 Ton Precast columns.
- 1st Building Project in India with 25.4m length / 136 Ton Pre-stressed beams.
- Use of 3D Volumetric Precast Lift Shafts & Stair Wells.
- Precast Prestressed Slabs with 2 Ton/Sqm loading.
KEY INFORMATION · GHMC AFFORDABLE HOUSING
GHMC AFFORDABLE HOUSING
Design, Supply & Installation of S + G + 9 Residential
KEY INFORMATION · L&T ENERGY HYDROCARBON
L&T ENERGY HYDROCARBON
Design, Supply & Installation of G+4 (36.4m) & G+3 (15m) & G+1 (10m) Substation Buildings
KEY INFORMATION · SAI LIFE SCIENCES R&T CENTRE
SAI LIFE SCIENCES R&T CENTRE
Design, Supply & Installation of G + 2 Storey
KEY INFORMATION · HIGH COURT OF ANDHRA PRADESH
HIGH COURT OF ANDHRA PRADESH
Hollow Core Slab Supply
KEY INFORMATION · JAKKAMPUDI ECONOMIC TOWNSHIP (JET CITY)
JAKKAMPUDI ECONOMIC TOWNSHIP (JET CITY)
Design, Supply & Installation of G + 5 Storey
KEY INFORMATION · BDA AFFORDABLE HOUSING
BDA AFFORDABLE HOUSING
Design, Supply & Installation of G+4 with Community Hall, UGR and STP tanks EWS Buildings 24 Blocks.
KEY INFORMATION · MUSHROOM PLANT
MUSHROOM PLANT
Design, Supply & Installation of G+1
KEY INFORMATION · VIRUPAKSHA GROUP
VIRUPAKSHA GROUP
Design, Supply & Installation of G + 5 Storey
KEY INFORMATION · SATTVA IMAGE TOWER
SATTVA IMAGE TOWER
Supply of Hollow core slabs for 4B+G+20 Storey
Project Credentials
| # | Client | Project | Area | Status |
|---|---|---|---|---|
| 01 | HIC Infrastructure | Amazon Data Center · Facade Wall Supply | 2,366 m² | Completed |
| 02 | AP Urban Infra | Commercial Building (G+5) · Jakkampudi, AP | 60,000 m² | Completed |
| 03 | Bhubaneswar Dev. Authority | Affordable Housing (G+4) · Bhubaneswar | 55,000 m² | Completed |
| 04 | KEC International Ltd | Sattva Image Towers · HCS Supply | 1,21,941 m² | Completed |
| 05 | Hindustan Coca-Cola Beverages Ltd | Bottling Production Plant | 27,870 m² | Completed |
| 06 | SR University, Warangal | Library Block | 5,530 m² | Completed |
| 07 | Tribal Welfare Department | Student Hostel · JNTU, Hyderabad | 9,290 m² | Completed |
| 08 | Virupaksha Group, Hyderabad | Production Block-4 & Warehouse | 6,640 m² | Completed |
| 09 | TS Education Dept. | TSWR School & Degree College · Bachupally | 5,615 m² | Completed |
| 10 | Sai Life Sciences | R&T Facility (G+2) · Hyderabad | 7,432 m² | Completed |
| 11 | Mr. Sivarama Subrahmanyam | Commercial Mall (2B + G + 5) · Rajahmundry | 6,968 m² | Completed |
| 12 | L&T (ECC) | Hollow Core Slabs · AP Judicial Complex, Amaravati | 12,000 m² | Completed |
| 13 | Eco-care | Hollow Core Slabs · GHMC Project, Hyderabad | 16,250 m² | Completed |
| 14 | L&T (ECC) | Precast Facade Walls · IIT Hyderabad | 2,500 m² | Completed |
| 15 | SR Engineering College | Precast Column-Beam Frame · Academic Block | 5,812 m² | Completed |
| 16 | GHMC | Affordable Housing (2S+9) · Hyderabad | 62,500 m² | Completed |
| 17 | Maharaja Mushroom (Own) | Mushroom Production Plant | 17,640 m² | Completed |
| 18 | Inventaa Industries (Own) | Precast Factory · Keesara, Andhra Pradesh | 20,000 m² | Completed |
| 19 | Inventaa Industries (Own) | Precast Factory · Hyderabad, Telangana | 7,200 m² | Completed |